Scope of Work : Construction of 500 housing units for the immigrants in Yalova. Total closed are is 40.000 m2 using tunnel formwork method. 2 units of 800 KVA transformer building, 1662 m. road pavement, 1147 m. sanitary pipeline with all other infrastructural works and landscaping were realized.