Railway Construction Between Nurdağ Başpınar Stations

  • Client : TCDD-GENERAL DIRECTORATE OF TURKISH STATE RAILWAYS
  • Location : Gaziantep/TURKEY
  • Scope of Work: Infrastructure Works, Viaduct, Culvert, Underpass, Overpass and Tunnel Construction and Tunnel Water Depot Manufacturing Works, Superstructure Manufacturing, Tunnel Electrical Installation Works, Tunnel Fire Installation Works and Station Roads are included.

    In this project scope 2 station buildings, 6 tunnels and 1.400 m. viaduct is included. Total track line is 53 km.Total TBM excavation is 12,5 km. and total NATM excavation is 19 km.
  • Start Date : 02.05.2017
  • Finish Date : Ongoing