Kirka V. Borax Pentahydrate Plant
- Client : General Directorate of Eti Mine Works
- Location : Eskisehir / TURKEY
- Scope of Work : Within the scope of works, performance guaranteed, a 500,000 tons/year capacity Borax Pentahydrate main facility and the supplementary facilities for the production of steam, electricity, energy, water, ore crushing and preperation, etc has been built. The contract includes process design, basic and detailed engineering services, machinery and equipment, instruments control system, engineering, procurement, construction, installation, commissioning, performance testing, educational training.
- Start Date : 23.01.2012
- Finish Date : 27.11.2015