Gurpinar Wastewater Tunnel

  • Client : Istanbul Metropolitian Municipality
  • Location : Istanbul / TURKEY
  • Scope of Work :
    • Tunnel construction with TBM (Tunnel Boring Machine) having Ø2600 mm. internal diameter, pre-cast segmental lining as 1st and reinforced concrete lining as 2nd layer,
    • Total length of tunnel between start and end points is 5.227 meters.
    • Shaft construction with external diameter 9 m. (3 ea)
    • Branch tunnel construction of Ø2000 mm. internal diameter and 1000 meters long.
  • Start Date : 01.11.2006
  • Finish Date : 01.11.2009