Bogazkoy Wastewater Tunnels & Collectors
- Client : Istanbul Metropolitian Municipality
- Location : Istanbul / TURKEY
- Scope of Work :
- Tunnel construction with TBM (Tunnel Boring Machine) having Ø2000mm internal diameter,
- Pre-cast segmental lining as 1st and reinforced concrete lining as 2nd layer,
- Total length of tunnel between start and end points is 3.218 meters,
- Shaft construction with external diameter 11 m. (2 ea),
- Shaft construction with external diameter 9 m. (2 ea)
- Start Date : 26.03.2006
- Finish Date : 25.09.2008