Bogazkoy Wastewater Tunnels & Collectors

  • Client : Istanbul Metropolitian Municipality
  • Location : Istanbul / TURKEY
  • Scope of Work :
    • Tunnel construction with TBM (Tunnel Boring Machine) having Ø2000mm internal diameter,
    • Pre-cast segmental lining as 1st and reinforced concrete lining as 2nd layer,
    • Total length of tunnel between start and end points is 3.218 meters,
    • Shaft construction with external diameter 11 m. (2 ea),
    • Shaft construction with external diameter 9 m. (2 ea)
  • Start Date : 26.03.2006
  • Finish Date : 25.09.2008