Firuzkoy Wastewater Tunnel
- Client : Istanbul Metropolitian Municipality
- Location : Istanbul / TURKEY
- Scope of Work :
- Tunnel construction with TBM (Tunnel Boring Machine) having Ø2600mm. internal diameter,pre-cast segmental lining as 1st and reinforced concrete lining as 2nd layer,
- Total length of tunnel between start and end points is 3.770 meters,
- 5 tunnel shaft construction,
- Branch tunnel construction of Ø1800/1200 mm. internal diameter and 300 meter long
- Construction of wastewater collectors of Ø3600 mm. diameter and 1160 meter long.
- Start Date : 01.12.2008
- Finish Date : 15.12.2011