Sariyer - Cayirbasi Motorway Tunnel

  • Client : Istanbul Metropolitian Municipality
  • Location : Istanbul / TURKEY
  • Scope of Work : Construction of 2x2100 m. motorway tunnel (NATM) with two lanes between Sarıyer and Çayırbaşı.
  • Start Date : 03.12.2007
  • Finish Date : 03.09.2011
TOP