Turkey - Greece Natural Gas Pipeline - Phase 2 - Offshore Section

  • Client : Botas Petroleum Pipeline Corporation
  • Location : Canakkale / TURKEY
  • Scope of Work : Construction of offshore section (Marmara sea crossing) of Turkey – Greece Natural Gas Pipeline. Total offshore length of the pipeline is 17km. and 36” inch in diameter. All the operations carried out by a adjoining derric lay barge. Pipeline was laid at a maximum depth of 68m. under sea. Besides, 330 m. of pipeline was laid onshore.
  • Start Date : 01.11.2005
  • Finish Date : 15.07.2007